Flowscreed ongoing in Newquay, Cornwall.
Covering work from Cornwall, up the M5 to the Cotswolds, across the M4 to London, around the M25, and back down the M3 into Hampshire picking up work throughout the forest on the way back to base.
05/07/23 - Newquay, Corwall
Previous
Previous
19/07/23 - 1000m2 Flowscreed in Southampton
Next
Next